Available load
195 kVA
Estimated working load at the configured operating percentage.
Estimate primary and secondary current at full load and at the expected operating load level.
Assumptions used by this calculator
Available load
195 kVA
Estimated working load at the configured operating percentage.
Primary current
13.12 A
Full-load primary current at transformer rated kVA.
Secondary current
360.84 A
Full-load secondary current at transformer rated kVA.
Expected primary current
10.23 A
Primary current at the configured expected load percentage.
Expected secondary current
281.46 A
Secondary current at the configured expected load percentage.